Skip to main content

About your Search

20100923
20100923
Search Results 0 to 0 of about 1
. lots of road work to talk about. as usual the bulk of it in northern virginia at this point. we'll head on over. here we are at 95 southbound as we make the trip from newington on down. construction takes away the right lane. but if you look very carefully, you can see the hov lanes are configured for the southbound flow. that should help alleviate the delays getting to this point at the work zone. obviously, it is still going to be slow. let's head on over another stretch of the beltway. on the inner loop of the beltway from springfield up towards i-66, very slow through the work zone. in addition, there had been a broken downehicle in the roadway. that has been moved ov to the shoulder. so right now it's just the work zone, but the broken down car has been cleared. we'll keep you updated. eun? >> thank you so much, jerry. >>> well, you may want to avoid parts of t street in northwest washington right now. crews are working to repair a broken water main in the 1300 block of t street. the street is closed between 13th streets and 14th streets. it's not clear when it will be fixed or whe
Search Results 0 to 0 of about 1